athletic field lighting
Rated Power: 1200W
Input Voltage: AC90-305, DC127-431
Color Temperature: 2700K-6500K
Lamp Efficiency: 130LM/W
Beam Angle: 15°, 20°, 30°, 40°, 60°, 120°, 140°x60°.
CRI: Ra>75
IP Grade: IP67
Bracket: Stainless Steel
Net Weight: 40KG
Warranty: 5 Years
Certificate:RMRS CE, RoHS, SAA, C-Tick, UL, DLC, CB, ISO:9001
- Product Description
Transform Your Sports Venue with Stadium-Athletic Field Lighting
Last Updated: January 2025 | By Mike Chen, Sports Lighting Specialist
Speedy Take:Our athletic field lighting cut vitality costs by 50% vs. conventional frameworks whereas conveying broadcast-quality light. Utilized by 200+ offices over North

The Problem With Traditional Sports Lighting
Does this sound familiar?
- Skyrocketing power bills cutting into your budget
- Constant bulb substitutions disturbing events
- 15-minute warm-up times deferring games
- Poor color rendering destroying broadcast quality

Athletic Field Lighting Specification
| Feature | Specification |
| Model Number | RGL-1200A |
| Rated Power | 1200W |
| Input Voltage | AC100-305, DC127-431 |
| Color Temperature | 2700K-6500K |
| Lamp Efficiency | 130LM/W |
| Lumen Output | 156000LM |
| Beam Angle | 15°, 20°, 30°, 40°, 60°, 120°, 140°x60° |
| Lens | Tempered Glass |
| Working Temperature | -40° - 60°/ 40F - 140F |
| CRI | Ra>75 |
| IP Grade | IP67 |
| IK Rating | IK10 |
| LED Chip | Samsung/Phillip |
| LED Driver | Meanwell |
| Housing | Aluminum Alloy |
| Bracket | Stainless Steel |
| Net Weight | 40KG |
| Warranty | 5 Years |
| Certificates | RMRS,CE, RoHS, SAA, C-Tick, UL, DLC, CB, ISO:9001 |
| More Available Powers | 90W,120W, 150W, 180W, 210W, 270W, 200W, 300W, 400W, 500W, 600W, 800W, 1000W, 1200W |

Our Solution: Industrial-Grade LED That Pays for Itself
- The R1000 Arrangement: Built for Performance
- Power:1000W Led (replaces 2000W metal halide)
- Efficiency:130 lumens per watt — among the most noteworthy in the industry
- Lifespan:50,000+ hours (that's 15+ a long time at ordinary usage)
1. Instant-On Technology
No warm-up = no delays. Lights reach full brightness in beneath 2 seconds.
2. Military-Grade Durability
- IP67 waterproof rating (survives brief submersion)
- Stainless steel brackets stand up to corrosion
- Tested to withstand 150 mph winds
3. Smart Thermal Management
Our protected cooling framework keeps LEDs 30% cooler than competitors, expanding life by years.
4. Broadcast-Ready Color
CRI >75 ensures accurate colors for HD cameras. ESPN-approved for televised events.

Who This Is Perfect For
Professional & College Stadiums
Need broadcast-quality lighting for televised events? Our athletic field lighting systems meet NCAA and professional league standards.
High Schools & Universities
Budget-conscious? Energy savings pay for the system in ~2 years. Plus, minimal maintenance fits tight schedules.
Municipal Parks
Extend field usage into evening hours. More programs = more community value + potential rental revenue.
Private Training Facilities
Consistent, flicker-free lighting improves video analysis and athlete performance tracking.



Why Razorlux? (The Honest Answer)
We're not the cheapest option. Here's what you're paying for:
26 Years Manufacturing LEDs (Since 1998)
We've been refining LED technology since before most competitors existed. Our Xi'an facility holds 200+ patents.
R&D That Actually Innovates
10 PhDs on staff. 30% of our team has engineering degrees. We don't just assemble parts — we design at the chip level.
Real Warranty (Not Fine Print)
5 years, full replacement. Average response time: 18 hours. We stock parts in North America.

Frequently Asked Questions
Q: How long does shipping take?
A: 3-4 weeks for standard orders. Require quicker? Inquire almost our express program (7-10 days).
Q: Do you offer financing?
A: Yes, through our accomplices. Qualified buyers can get 0% for 24 months.
Q: What if I'm not satisfied?
A: 30-day trial period. Not cheerful? Return for a full discount (we've had 2 returns in 5 years).
Q: Can these be dimmed?
A: Completely. We bolster 0-10V, DALI, and DMX conventions. Awesome for multi-use offices.
Q: What about installation?
A: We provide detailed plans and remote support. Many customers use local electricians — typical install is 2-3 days for an 8-pole field.
Ready to Upgrade?
Contact our athletic field lighting's team:sam@razorlux.com

_1750326878398.png)












